Project objectives
A railway tunnel in Switzerland provides a rail link through the Alps. The tunnel is 57.1 km long, or 153.4 km including service and pedestrian passages. A train can travel through the tunnel from Zurich to Milan in just over two hours (four hours by plane), at speeds of up to 250 km/h.⠀⠀
The Gotthard railway tunnel differs from all other similar projects in the world, particularly in its tunnel logistics and operational support systems.⠀
⠀
WHY DYNACO⠀
⠀
DYNACO doors are installed in service areas. Advantages of Dynaco high-speed doors:⠀
⠀
• High wind load — up to 160 km/h⠀
• Opening speed - 2.4 m/s, closing speed - 1.2 m/s⠀
• Resistance to damage⠀
• Automatic self-reinsertion⠀
• Intensity — 6,000 cycles per day⠀
• Exceptional airtightness⠀
• Absolute safety⠀
Key parameters
160 km/h
High wind load
6 000 cycles per day
Operating intensity
2,4 m/s
Opening speed